Отчет о строительных работах на объекте "Металлургический" - 1-ый этап

Report on construction work at the facility "Metallurgical" - 1st stage

Отчет о строительных работах на объекте "Металлургический" - 1-ый этап Отчет о строительных работах на объекте "Металлургический" - 1-ый этап Отчет о строительных работах на объекте "Металлургический" - 1-ый этап
A report on the implementation of works on construction of transformer substation "Metallurgical" step 1



the



the



the



the



the



the



the



the



the



the



the



the



the



the



the



the



the



the



the



the



the



the



the



the





 description                   

 Description of work performed 

 Box

 

 the Foundations


Of the 52 Foundation 52 drenched



Work is underway to backfill of foundations


Work is underway on the installation of Foundation beams


     Frame


There are only 36колонн  (36 columns and 16 stands of timber-framing)



Completed the installation of the struts and ties between the columns in axes A and B



Set spacers between the columns axis In



Set on 10 farms (24 farms)



Brought on the object 7 farms



Made 86 runs of the roof (234 runs). A large part of the runs mounted


On the trade contractor performed work for the production of half-timbered stands and crane girders, trusses, beams of the roof.


     Roof

Brought on the object of prof sheet for roofing (report 24.06)

     Wall

The object imported sandwich panels

     Windows

 

     Door/gate

 

     Floors

Preparation for conclusion of a contract


     External communication

 

     water

Tender (deadline  27.07.2016)

     sewage

Tender (deadline  27.07.2016)


     the stormwater Drainage

Tender (deadline  27.07.2016)

     Pipeline


Suspended the signing of the contract designing and laying out changes to the track pad. The works July-August



     al.supply

Work is underway in preparation for designing outdoor track 


     Internal communications

 

     water 

 

     sewage

 

     heating

The contract for the supply of "Thermals" on the approval

     al.supply

 

     Landscaping

 

     Interior trim

 

     OTHERS

 

     Foundations phase II

Contract signing 




A nice bonus: you can participate in mini-oprosnik of social networking on the theme "What I would add I am in my production room?" Classmates, Facebook, Vkontakte.
Share object in the social. networks:
Меню сайта