Отчет о строительных работах на объекте "Металлургический"

Report on construction work at the facility "Metallurgical"

Отчет о строительных работах на объекте "Металлургический" Отчет о строительных работах на объекте "Металлургический" Отчет о строительных работах на объекте "Металлургический" Отчет о строительных работах на объекте "Металлургический" Отчет о строительных работах на объекте "Металлургический" Отчет о строительных работах на объекте "Металлургический" Отчет о строительных работах на объекте "Металлургический" Отчет о строительных работах на объекте "Металлургический"
A report on the implementation of works on construction of transformer substation "Metallurgical" step 1



the



the



the



the



the



the



the



the



the



the



the



the



the



the



the



the



the



the



the



the



the



the



the



the





 description                   

 Description of work performed 

 Box

 

 the Foundations


Work on the installation and concreting of Foundation pile beam 1 (the passage to the building).



Insulating the basement.



 Frame


Installation of ties and braces in 2 spans.



Installation of purlin roof in 4 bays.



     Roof

Started assembling the lower prof sheet roof (installed 400m2)


     Wall

Work has begun on installation of the sandwich wall panels (installed 800m2)

     Windows

Auction

     Door/gate

Auction. check Out possible suppliers on the measurement of gate opening from 16 to 22 August.


     Floors

The completed tender is the analysis of the results.


     External communication

 

     water

The signing of the contract for execution of works


     sewage

The signing of the contract for execution of works


     the stormwater Drainage

The signing of the contract for execution of works


     Pipeline


Suspended the signing of the contract designing and laying out changes to the track pad. Work - August.



     al.supply

Received the technical specifications.


     Internal communications

 

     water 

 

     sewage

 

     heating

Advance payment for the supply of "Thermals". Tender completed, is the analysis of the results.

     al.supply

 

     Landscaping

Performed work on a rough layout of the site between the building and existing road

     Interior trim

 

     OTHERS

 

     Foundations phase II

The contract is signed by the contractor expects to receive an advance payment.